Home-service prices in Saudi Arabia 2026

All the prices we track, by service. Free to reuse with a link to manzelk.com (CC BY 4.0). prices.csv

Plumber

JobUnitLowMedianHighSources
Plumber visit / diagnosis feeper visit44 SAR100 SAR150 SAR4 sources
Drain unblocking (bathroom / kitchen / sink)per job70 SAR300 SAR600 SAR9 sources
Septic tank pumpingper truck load150 SAR550 SAR1,500 SAR6 sources
Main sewer line unblockingper line (job)300 SAR588 SAR1,000 SAR4 sources
Mixer / faucet install or replacementper job (labour)80 SAR165 SAR300 SAR3 sources
Water heater installationper heater70 SAR275 SAR500 SAR3 sources

Water leak detection

JobUnitLowMedianHighSources
Apartment leak inspectionper apartment100 SAR312 SAR500 SAR6 sources
Leak detection visit (electronic inspection)per visit100 SAR162 SAR800 SAR12 sources
Villa leak inspectionper villa200 SAR600 SAR1,200 SAR6 sources
Water tank leak inspection (Riyadh)per tank180 SAR245 SAR800 SAR4 sources
Swimming pool leak inspectionper pool150 SAR550 SAR1,500 SAR3 sources

Furniture movers

JobUnitLowMedianHighSources
Apartment move within the cityper move250 SAR800 SAR2,200 SAR5 sources
Villa move within the cityper move1,200 SAR2,425 SAR5,500 SAR4 sources
Furniture move Riyadh–Jeddahper move1,200 SAR2,375 SAR8,000 SAR3 sources

Water tank cleaning

JobUnitLowMedianHighSources
Home water tank cleaning & disinfection (by size)per tank100 SAR300 SAR800 SAR8 sources
Water tank insulation (lining)per tank150 SAR1,000 SAR2,500 SAR6 sources
Roof (upper) tank cleaning (Buraidah)per tank100 SAR155 SAR300 SAR3 sources
Ground tank cleaningper tank220 SAR425 SAR650 SAR3 sources

Shades and fences

JobUnitLowMedianHighSources
Car parking shade (any material)per m²60 SAR250 SAR500 SAR5 sources
PVC fabric shadeper m²85 SAR135 SAR380 SAR8 sources
Polyethylene (HDPE) fabric shadeper m²80 SAR100 SAR200 SAR7 sources
Polycarbonate (Lexan) shadeper m²180 SAR290 SAR420 SAR6 sources
Steel privacy screens / fencesper m²80 SAR150 SAR450 SAR5 sources
Fabric privacy screens (PVC / PE)per m²70 SAR110 SAR220 SAR5 sources

Roof insulation

JobUnitLowMedianHighSources
Spray polyurethane foam roof insulationper m²25 SAR42 SAR120 SAR15 sources
Roof waterproofing (bitumen / membrane)per m²15 SAR30 SAR60 SAR14 sources
Combined waterproofing + thermal systemper m²35 SAR74 SAR110 SAR6 sources
Roof thermal insulation (boards / other, not spray foam)per m²15 SAR50 SAR90 SAR4 sources
Waterproofing over existing tiles (no removal)per m²15 SAR40 SAR70 SAR4 sources

Demolition

JobUnitLowMedianHighSources
Demolishing a whole villaper villa (total)6,000 SAR19,500 SAR55,000 SAR5 sources
Annex / partial demolition (Riyadh)per job2,000 SAR4,000 SAR7,000 SAR3 sources
Full demolition with heavy equipment (haulage extra) (Riyadh)per m² of built-up area15 SAR32 SAR50 SAR2 sources
Debris removalper truck trip260 SAR390 SAR600 SAR2 sources
Demolition in exchange for the scrap steel (Riyadh)per buildingUsually no fee: the contractor keeps the scrap2 sources
Breaking out and filling a poolper pool3,000 SAR5,875 SAR8,500 SAR2 sources

Drilling

JobUnitLowMedianHighSources
Concrete core drilling (one hole) (Riyadh)per hole45 SAR181 SAR350 SAR6 sources
Core hole for a split AC (Riyadh)per hole50 SAR90 SAR150 SAR3 sources
Concrete wall cutting (Riyadh)per linear metre50 SAR185 SAR550 SAR3 sources