Demolition companies in Abha: phone numbers and 2026 prices
Here are the phone numbers of 5 demolition providers in Abha with their Google ratings and districts, plus published 2026 prices (Demolishing a whole villa: SAR 6,000–55,000 per villa (total)). We have not chosen a pick here yet: none met all our rules.
Phone numbers: Demolition in Abha
| Company | Phone number | District | Google rating | Last check |
|---|---|---|---|---|
| 1. سكراب القمة الوحيد في ابها SCRAP METAL | 055 589 8533 | المحالة | 4.8 (147 reviews) | From Google Maps · |
| 2. سكراب خميس مشيط لشراءالحديد | 050 823 5459 | – | 5.0 (8 reviews) | From Google Maps · |
| 3. هدم مباني وشراء سكراب في ابها وخميس مشيط | 050 254 4965 | – | 4.9 (9 reviews) | From Google Maps · |
| 4. سكراب مؤسسة عمر العواجي لتجارة المعادن | 056 507 7270 | – | 4.3 (35 reviews) | From Google Maps · |
| 5. جود لهدم المباني و شراء السكراب | 058 116 0097 | – | – | From the company website · |
Numbers as published by each business on Google Maps or, where marked, on its own website. Ratings read .
Where these providers are based in Abha
| District | Providers |
|---|---|
| المحالة | سكراب القمة الوحيد في ابها SCRAP METAL (055 589 8533) |
This is where each business is based on Google Maps. Most serve the whole city; ask when you call.
Demolition prices in Abha (2026)
| Job | Unit | Low | Median | High | Sources |
|---|---|---|---|---|---|
| Demolishing a whole villa | per villa (total) | 6,000 SAR | 19,500 SAR | 55,000 SAR | 5 sources |
| Annex / partial demolition (Riyadh) | per job | 2,000 SAR | 4,000 SAR | 7,000 SAR | 3 sources |
| Full demolition with heavy equipment (haulage extra) (Riyadh) | per m² of built-up area | 15 SAR | 32 SAR | 50 SAR | 2 sources |
| Debris removal | per truck trip | 260 SAR | 390 SAR | 600 SAR | 2 sources |
| Demolition in exchange for the scrap steel (Riyadh) | per building | Usually no fee: the contractor keeps the scrap | 2 sources | ||
| Breaking out and filling a pool | per pool | 3,000 SAR | 5,875 SAR | 8,500 SAR | 2 sources |
Saudi-wide published prices; prices companies publish on their own websites, read 7 Nov 2026. The final price comes after an on-site inspection. Sources
How to choose demolition in Abha
Ask and check
- Ask whether they obtain the demolition permit on Balady through an approved engineering office, and who pays the fee.
- Have them inspect the site before pricing, especially for demolition for scrap, since the scrap value sets the offer.
- Get a written contract stating what the job covers: demolition, foundations, debris removal, levelling, and who keeps the scrap.
- Ask where the debris will go, since it falls under the ministry's construction and demolition waste rules.
- Check for a valid commercial registration that lists demolition, and ask how they will protect neighbouring buildings and who pays for any damage.
Warning signs
- Offers to start before the permit is issued, or says no permit is needed.
- Agrees to demolish for scrap, then asks for extra money after taking the steel.
- The quote does not say who removes the debris or where it goes.
- Says nothing about protecting neighbouring buildings and passers-by.
What moves the price
- Building area in m² and number of floors
- Construction type: reinforced concrete, block, or steel frame
- How much scrap is expected and what it is worth, for demolition for scrap
- Volume of debris and the distance to where it is disposed of
- How close the building is to neighbours and streets, and the protection that requires
- What the quote covers: removing foundations, levelling, and permit fees
Permits and rules
The demolition permit is issued online on Balady, the Ministry of Municipalities and Housing platform, and the fee is charged per m² under the municipal services fees regulation. An engineering office approved by the ministry is required, and the debris falls under the ministry's construction and demolition waste rules. The same applies to demolition for scrap: how the contractor is paid does not change the permit requirements.
Questions people ask
How much does it cost to demolish a villa in Abha?
Demolishing a whole villa: SAR 6,000–55,000 per villa (total) The final price depends on the area, the number of floors, the construction type and the scrap value, and whether debris removal is included.
Does demolishing a building need a permit?
Yes. The demolition permit is issued online on Balady, the fee is charged per m², and an engineering office approved by the ministry is required. Ask the contractor whether they handle the permit with the office or you do.
What does demolition for scrap mean?
It is a deal where the contractor keeps the steel and metal from the building in return for a lower fee, or instead of any fee. It depends on how much scrap the building holds, so get an inspection and write into the contract what the job covers and who removes the debris.
How do I choose a demolition company in Abha?
Ask whether they get the permit through an approved engineering office, get an inspection before a price and a written contract covering debris removal and who keeps the scrap, and check the commercial registration. This page lists 5 demolition firms in Abha that published their own numbers.
Where does demolition debris go?
Demolition debris falls under the ministry's construction and demolition waste rules, so ask the contractor where it will go and write into the contract that removal is their responsibility.
Related
Other services in Abha:
Nearby cities:
Data read 7 Nov 2026. Wrong number? Tell us.